RFB #8199 MS Tank No. 1 – Internal Coating and Repair Project
Posted October 14, 2015

Due date: Nov. 5, 2015, by 3 p.m.

Mandatory Pre-Bid Meeting: A pre-bid meeting will be held on October 22, 2015 at 11:00AM at the Sacramento Regional Wastewater Treatment Plant (8521 Laguna Station Rd, Elk Grove, CA 95758). The purpose of the meeting is to review and clarify project requirements, conduct site inspection, and to respond to questions from the bidders. Attendance is MANDATORY. Pre-Bid Meeting attendees must e-mail Tamblynn Stewart at stewartt@sacsewer.com with attendee names to RSVP prior to the meeting. This information is required to provide access at the Treatment Plant’s security gate.

Bid Request Document: Detailed bid request document RFB #8199 can be obtained by contacting Tamblynn Stewart at (916) 875-9014 or stewartt@sacsewer.com.

Project Contact:
Aaron Bihlman
(916) 875-9214
bihlmana@sacsewer.com

RFB #8199 MS Tank No. 1 - Internal Coating and Repair Project

Addendum #1

Questions & Answers

Post

RFP#8196 Temporary Services: Mechanical Maintenance Technician
Posted September 29, 2015

DUE DATE: October 14, 2015, by 3:00 p.m.

Detailed proposal request document RFP#8196 can be obtained by contacting the Issuing Officer, Tamblynn Stewart at (916) 875-9014 or stewartt@sacsewer.com.

QUESTIONS: Due to T. Stewart  by October 6, 2015

Post

Request For Proposals – Waste Removal Services #8197
Posted August 25, 2015

DUE DATE: September 17, 2015, by 3:00 p.m.

MANDATORY PRE-PROPOSAL MEETING AND JOB WALK:                September 3, 2015, 8:00 a.m.

QUESTIONS: Submit all questions by September 9, 2015, by 3:00 p.m.

CONTACT:
Katherine Manne
(916) 876-6074
mannek@sacsewer.com

Waste Removal Services RFP No. 8197

Addendum 1 – posted 9/4/15

Post

Request for Bid – Biogas Facility Valve Replacement Project
Posted July 30, 2015

BID DATE: August 19, 2015, by 3:00 p.m.

MANDATORY JOB WALK: August 11, 2015, at 9:00 a.m. at Sacramento Regional Wastewater Treatment Plant, 8521 Laguna Station Road, Elk Grove, CA 95758

Attendees must e-mail Tamblynn Stewart at stewartt@sacsewer.com with attendee names to RSVP prior to the meeting. This information is required to provide access at the Treatment Plant’s security gate.

CONTACT:
Gerardo Aguirre
(916) 875-9075
aguirreg@sacsewer.com

Request for Bid – Biogas Facility Valve Replacement Project

Drawings

Specifications

Addendum 1

Post

Request for Bid – Non-Potable Water Fill Stations Project
Posted June 24, 2015

BID DATE: July 16, 2015

MANDATORY JOB WALK: July 2, 2015, 9 a.m., at the Sacramento Regional Wastewater Treatment Plant (8521 Laguna Station Rd, Elk Grove, CA 95758). Attendees must e-mail Tamblynn Stewart at stewartt@sacsewer.com with attendee names to RSVP prior to the meeting. This information is required to provide access at the Treatment Plant’s security gate.

CONTACT:
Tamblynn Stewart
(916) 875-9014
stewartt@sacsewer.com

Request for Bid – Non-Potable Water Fill Stations Project

Drawings for Non-Potable Water Fill Stations Project

Specifications for Non-Potable Water Fill Stations Project

Addendum 1 – posted 7/16/15

Addendum 2 – posted 7/16/15

Addendum 3 – posted 7/16/15

Questions and Answers – posted 7/16/15

Addendum 4 – posted 7/20/15

Post

Notice to Contractors – Digester No. 4 Rehabilitation Project
Posted May 27, 2015

NEW BID DATE: July 9, 2015

MANDATORY PRE-BID CONFERENCE: June 17, 2015, 9:00 a.m. at the Sacramento Regional Wastewater Treatment Plant (8521 Laguna Station Rd, Elk Grove, CA 95758). Attendees must e-mail Bill Chavez at chavezb@sacsewer.com with attendee names prior to the meeting.

CONTACT:
Bill Chavez, Project Manager
916-876-6015
chavezb@sacsewer.com

Notice to Contractors – Digester No. 4 Rehabilitation Project

Addendum 1 to Digester No. 4 Rehabilitation Project – posted 6/25/15

Addendum 2 to Digester No. 4 Rehabilitation Project – posted 7/6/15

Post

Notice to Contractors – Sims Road Resurfacing Project
Posted May 14, 2015

Regional San invites sealed bids to provide all labor and equipment necessary for RFB #8190 – Sims Road Resurfacing Project.

Due Date: June 4, 2015, 2:00 p.m.

Pre-bid Meeting: A non-mandatory pre-bid meeting will be held on May 26, 2015, at 9:00 a.m. at the Sacramento Regional Wastewater Treatment Plant (8521 Laguna Station Rd, Elk Grove, CA 95758). The purpose of the meeting is to review and clarify project requirements, conduct site inspection, and to respond to questions from the bidders. Pre-Bid Meeting attendees must e-mail Ami Patrick at patricka@sacsewer.com with attendee names to RSVP.

Detailed Bid Request Document: A detailed bid request document RFB #8190 can be obtained by contacting Tamblynn Stewart at (916) 875-9014 or stewartt@sacsewer.com

Post

RFP for On-Call Environmental Engineering Services
Posted October 17, 2014

Note: Addendum posted October 30, 2014

The objective of this request is to retain a Consultant to perform environmental engineering services for Regional San on an as-needed basis.

Due Date: November 20, 2014, at 3 p.m.

Contract Term: The anticipated term for the on-call environmental engineering services contract shall be two (2) years, with the potential opportunity to extend.

Contract Amount: The contract not-to-exceed amount shall be $50,000.

Questions?

Steve Nebozuk, Senior Civil Engineer
Phone: (916) 876-6118
Email: nebozuks@sacsewer.com

RFP for On-Call Environmental Engineering Services

Addendum to RFP for On-Call Environmental Engineering Services NEW!

Post

RFP for On-Call Geotechnical Engineering Services
Posted October 9, 2014

The objective of this request is to retain a Consultant to perform geotechnical investigation, evaluation, and design services for Regional San on an as-needed basis. The contract not-to-exceed amount shall be $100,000.

Due Date: November 14, 2014, at 3 p.m.

Questions?

Steve Norris, Senior Civil Engineer
Phone: (916) 876-6053
Email: norriss@sacsewer.com

Post

RFP for Engineering Services NPDES Permit Renewal
Posted September 26, 2014

Sacramento Regional County Sanitation District (Regional San) is soliciting proposals from qualified consulting firms to assist in renewing its wastewater discharge permit.

Due Date: October 23, 2014, 3 p.m.

Questions: Robert Seyfried, (916) 876-6008, seyfriedr@sacsewer.com, or Vyomini Upadhyay, (916) 876-6677, upadhyayv@sacsewer.com

Pre-Proposal Conference: 2:00 p.m. on October 2, 2014, at Regional San offices at 10060 Goethe Road, Sacramento CA, 95827

Key Action Dates

Release of RFP: September 25, 2014

Pre-proposal Conference: October 2, 2014 (2:00 p.m.)

Mail-out of Addenda from Pre-Proposal Conference: October 7, 2014

Proposal Submission Deadline: October 23, 2014 (3:00 p.m.)

Notification of Selection: November 3, 2014

Please read the RFP below for complete details.

Post

RFP for Mail & Print Services (#8171)
Posted August 12, 2014

The Sacramento Regional County Sanitation District (Regional San) and Sacramento Area Sewer District (SASD) invite sealed bids to provide printing and mail house services necessary for future communication purposes.

Estimate: $85,000

Key Action Dates

RFP Issue: August 12, 2014

Questions Due: August 20, 2014                                                

Proposal Due Date: August 27, 2014

Proposal Evaluations Complete: September 11, 2014

Notice to Award: September 15, 2014

Insurance Certificate: September 29, 2014

Contract(s) Begins: October 1, 2014

RFP Documents

Mail & Print Services (RFP #8171)

Post

RFP for On-Call Structural Engineering Services
Posted August 11, 2014

The objective of this request is to retain two Consultants to perform structural evaluation and design services as described in this RFP on an as-needed basis.

Due Date: September 11, 2014

Questions?

Scott Hutcheson, Project Manager
Phone: 916-875-1217
Email: hutchesons@sacsewer.com

Post

RFP for Solar Photovoltaic Generating System
Posted July 25, 2014

The Sacramento Regional County Sanitation District (Regional San) is soliciting proposals from consultants experienced in the field of photovoltaic (PV) system design, installation and operation. Regional San anticipates executing an agreement with the selected consultant to identify and evaluate alternatives for a PV system to be installed at the Sacramento Regional Wastewater Treatment Plant (SRWTP) in Elk Grove, CA.

Due Date

Proposals due by 2:00 PM on August 27, 2014

Questions

Any questions regarding this RFP should be directed to the Project Manager, Steve Nebozuk at (916) 876-6118, or via email at nebozuks@sacsewer.com.

Request for Proposal

RFP for Solar Photovoltaic Generating System

Post

RFP for Liquid Sulfide Chemical Contract Service
Posted June 9, 2014

Regional San (formerly known as the Sacramento Regional County Sanitation District) is soliciting a request for proposals to establish an annual contract for proven chemical products that treat liquid phase hydrogen sulfide, equipment in conveying the product, and service to maintain the equipment and provide technical recommendations to Regional San.

Due Date: July 3, 2014

Post

RFP for Engineering and Geotechnical Studies for Solids Storage Basin and Corrective Action Program
Posted June 4, 2014

The Sacramento Regional County Sanitation District (Regional San) is seeking proposals for consulting services for (1) engineering and geotechnical studies to determine to what extent, if any, the Solids Storage Basins at the Sacramento Regional Wastewater Treatment Plant (SRWTP) are impacting groundwater (2) engineering and geotechnical studies to determine the effectiveness of the SRWTP’s Corrective Action Program in reducing nitrates, chlorides, total dissolved solids and specific conductivity in groundwater in groundwater downgradient of SRWTP’s solids disposal operations areas and (3)

Post

Engineering Services for Cathodic Protection Rehabilitation Project Phase II
Request for Proposal

Sacramento Regional County Sanitation District (Regional San) completed an initial evaluation of a limited number of cathodic protection systems at the Sacramento Regional Wastewater Treatment Plant (SRWTP) and interceptor systems. The evaluation was considered to be the first step in the development of an overall corrosion control strategy for Regional San.

Phase II is a continuation of the effort to evaluate the remaining systems that have not been tested.

Commands